Project Management

    In order to offer customers good quality molds and products and better lead time,we set up a project management department:

   1.When new project input,project manager and project engineer will join in the project process,work with engineering team to provide customers DFM report,Mold-flow analysis,Mold design(2D&3D).

   2.During manufacturing period,we will keep customers updated with weekly report contains

 detailed processed pictures.Each mold testing,not only T1 testing,our project engineer will record all the notes and make report well,also provided testing files(testing report,injection parameter,testing video) and samples dimension report for customers.

   3.Before mold shipping,engineers will check the mold carefully one by one accroding to clients’

check list and our own check list to ensure mold can run well at customers’ side when they arrived.

   4.After each mold shipped,we will make a detailed record(approved mold 2D&3D design,electrode,

all the testing files mold pics with retative parts,etc) in our computer system all the time,which can ensure mold repair service work well if clients neede after run the molds several years in their side.

project mangagement

project mangagement

project mangagement             project mangagement

 

 

wanted to work with us ?

Welcome to visit our factory and cooperate with us!

Reference: Project Management

mold classification
Mold Classfication
Hd3a8e3ad43de41a28b4a2f191c46ad17x
Project Management
CNC
Equipments
H91be10f8badf433187416ae5a92fa5c06
Spi Standards
图形1
Resin Shrinkage
supply chain
Supply Chain